TELSIAI BESS PARKAS 100 MW / 200 MWh

Projekto apžvalga

Projekto aprašymas

Telsiai BESS Park is a 100 MW / 200 MWh battery energy storage system planned in the Telsiai district. Strategically connected to the 30/330 kV transformer substation, the project ensures a highly cost-effective and technically optimized grid connection point.

  • Cost-Effective Connection: Due to the proximity of the 30/330 kV substation and the completion of grid connection conditions from the TSO (LITGRID), the location significantly reduces connection and implementation costs

  • Rapid Deployment: BESS technology ensures fast installation, with construction expected to be completed within approximately 6–9 months (from Q2 2027 to Q4 2027), allowing for prompt operational startup and an estimated payback period of just 2-4 years.